Category: Electronic engineering, electronics, mechanical engineering, material engineering
Deadline: 28/06/2019 r.
Announcement:
Design Analysis for the ITER Tokamak Engineering Department
The engineering services to be provided are related to the analysis support for the design, procurement, acceptance, installation and commissioning of ITER Tokamak components.
The estimated overall effort of the Framework Contract will be tentatively of about 40-50
professional person year.It includes the supporting analysis as required by the design and construction of the Tokamak components. It includes the following Areas of Expertise:– Electromagnetic analysis– Neutronic analysis– Computational fluid dynamic analysis– Thermal analysis– Mechanical analysis– Structural Integrity– French Regulation– Independent Peer Review
How to apply?
ITER Call for Tender is a staged procurement process for high value contracts as described below:
- Stage 1: Call for Nomination, where Domestic Agencies are formally requested to provide the names of potential candidates. The candidates shall liaise with relevant Domestic Agencies to express their interest for a required supplies, services or works. The IO could also add a potential candidate if needed after having informed the DA.
- Stage 2: Pre-qualification, where the IO will establish a list of qualified suppliers amongst the nominated entities, based on specific selection criteria. All nominated companies receive the pre-qualification package.
- Stage 3: Call for Tender, where only the pre-qualified candidates will receive the tender package from IO. Tenderers shall submit offers in response to the Call for Tender package composed of Instructions to Tenderers, IO Technical Specifications, Special and General Conditions of Contracts. The evaluation of the tenders submitted has two steps: first the technical offers are evaluated with respect to the award criteria indicated in the Instructions to Tenderers and only those obtaining scores higher than the technical threshold indicated shall be considered for the financial evaluation. The financial evaluation is based either on the combined quality and price scoring mechanism (best value) or on the cheapest technical compliant offer.