High Voltage Power Supply (HVPS) Units for ITER Ion Cyclotron System

Category: Electronic engineering, electronics, mechanical engineering, material engineering

Deadline: 04/08/2020 r.

 

Annoucement:

High Voltage Power Supply (HVPS) Units for ITER Ion Cyclotron System

The ITER Organization requires the design, the manufacturing, factory testing, delivery, installation and acceptance testing of 10 (out of 18) IC HVPS units to supply 5 (out of 9) IC RF Sources.

The activities consisting of:
• Engineering activities for the Final Design of the system
• Design review processes
• Inspections and quality records
• Documentation
• Supervision and reporting of the manufacturing process
• Factory testing
• Packaging and Transportation to the ITER site
• Assembly, installation at ITER site
• Final Acceptance Tests on ITER Site
• Training

Issue Date :
13 / 07 / 2020

CFN Deadline Date :
04 / 08 / 2020

 

Technical summary

Information on ITER website