Category: Electronic engineering, electronics, mechanical engineering, material engineering
Deadline: 04/08/2020 r.
Annoucement:
High Voltage Power Supply (HVPS) Units for ITER Ion Cyclotron System
The ITER Organization requires the design, the manufacturing, factory testing, delivery, installation and acceptance testing of 10 (out of 18) IC HVPS units to supply 5 (out of 9) IC RF Sources.
The activities consisting of:
• Engineering activities for the Final Design of the system
• Design review processes
• Inspections and quality records
• Documentation
• Supervision and reporting of the manufacturing process
• Factory testing
• Packaging and Transportation to the ITER site
• Assembly, installation at ITER site
• Final Acceptance Tests on ITER Site
• TrainingIssue Date :
13 / 07 / 2020CFN Deadline Date :
04 / 08 / 2020